Running a Job

From IWRAP
Revision as of 21:59, 6 April 2009 by Oferiks (talk | contribs) (New page: Select the Start Job tool button Image:20090406 Start Job Button.gif to initiate an analysis job. You find the Job Button in the Icon menu. [[Image:20090406 Start Job Button Location...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Select the Start Job tool button 20090406 Start Job Button.gif to initiate an analysis job.

You find the Job Button in the Icon menu.

20090406 Start Job Button Location.gif


This will bring up the start job dialog:

20090406 Start Job Dialog.gif

Enter a name for the job and press Ok. This will bring up the Job view with the new job shown at the top of Job List.

The Job will be in the “Executing” state. Wait for the job to go to the “Completed” state.

If the user selects a job (also a job that currently is executing) the result of the analysis will be displayed in the lower Result part of the Job View Window. If an executing job is selected the results of the analysis will continuously be updated. Several jobs can be selected by holding down the ctrl key. This makes comparing different versions of a particular model easier.

Image:20090406 Job View Compairing Results.gif